BUYER WORKSHEET
Move a private label blanket from sample to production
Use this plan after defining the product and shortlisting a supplier. It sets out the decisions needed at each handover so that a sample, quote and production order describe the same product.

Swipe or scroll the table horizontally to compare all columns.
| Milestone | Record to approve | Condition before moving on |
|---|---|---|
| 1. Product brief | A versioned specification and list of fixed, preferred and open requirements. | Confirm one owner for the brief and one quoted model configuration. |
| 2. Quote and sample route | Quote assumptions, sample cost, stock or custom sample, expected dispatch date. | Agree what the sample must demonstrate and how it will be reviewed. |
| 3. Sample approval | Sample identifier, photographs, review results and accepted changes. | Resolve failures and document any conditions before approving the reference. |
| 4. Artwork and document review | Model-to-report match, labels, instructions, barcode, pack and carton artwork. | Approve the correct versions; unresolved document scope stays open. |
| 5. Production release | Final specification, order quantity, approved sample, materials and inspection plan. | Confirm production timing against the agreed order conditions and material readiness. |
| 6. Pre-shipment review | Inspection result, quantity, packaging, traceability and transport handover records. | Agree handling of open inspection items before shipment arrangements are finalized. |
Separate production time from your launch date
The usual Cozynest production estimate is 15–20 days after order details and materials are confirmed. Sample review, additional testing, inspection, transport and destination receipt need their own allowances; the estimate is not an arrival-date promise.
Confirm the facility and project scope
Cozynest’s company profile lists a 12,000 m² factory base, 142 people and 8 production lines in Hebei, China. Review the factory and agree the exact blanket, pad, wearable or foot-warmer project with your supplier.
Keep one approved model file
Include the catalog reference, formal model, dimensions, textile, electrical configuration, controller, care instructions, labeling and packaging revisions. Name the buyer and supplier contacts who may approve changes.
Record sample approval in writing
Capture the review date, sample identifier, photos, accepted differences and open actions. If a controller, fabric or artwork changes later, identify whether a replacement sample, document review or schedule adjustment is needed.
Release only the versions you approved
Link labels and instructions to the approved model file. Record report identifiers and applicable configurations. The model-to-report guide below identifies current public files and items still needing confirmation.
Agree how each sample decision will be recorded
| Review item | Evidence to keep | Approval gate |
|---|---|---|
| Identity and construction | Reference, formal model, sample revision, photos, size and textile specification. | Both parties can identify the exact sample being approved. |
| Operation and care | Proposed controller, power configuration, instruction revision and review notes. | Follow the model instructions. Any safety evaluation belongs with qualified testing personnel. |
| Retail readiness | Label, manual, barcode and retail-pack proofs against the approved model. | Approved artwork versions are attached to the order. |
| Outcome | Accepted, revise and resubmit, or pending evidence; owner and date for each issue. | A pending item is not silently treated as approval. |
What happens when a component or deadline changes?
If a fabric, controller, plug, label or pack changes after approval, record the old and new revisions. Ask the supplier whether a new sample, document review, additional testing or revised quotation is needed. Obtain written approval before that revision is used.
Plan backwards from your requested receipt date: transport and import handling, pre-shipment review, production, material readiness, artwork and sample approval. Ask for each milestone separately; a factory production estimate does not include all of these stages.
FAQ
When does the 15–20 day estimate start?
After order details and materials are confirmed, subject to final order conditions. Confirm the actual schedule in writing and separate sampling, testing and transport.
What if the specification changes after approval?
Record the change, affected sample or artwork revision, document implications, cost and revised schedule. Obtain approval before using the changed specification.